Clause 2.12 (Hydraulic Design – Foul Sewers)
|
| 2.12.1
specifies design flows for gravity sewers for residential
developments. |
|
System
1 – Foul (Main Drainage Method) enables
compliance. |
| 2.12.2
provides design flows for industrial developments, calculated
in accordance with BS EN 752-4. |
|
System
1 – Foul (Fixture Unit Method) enables
compliance. |
| 2.12.3
self cleansing regime is stated. |
|
System
1 – Foul (Main Drainage Method & Fixture
Unit Methods) enable compliance. |
| Foul
Design is covered in the Design Fundamentals training course. |