WinDes Design Process
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
Phase 7
Phase 8
Phase 9
Phase 10
Phase 11
Back to WinDes
Phase 3 - Optimise
Optimise System Messagebox
DrawNet
Optimise

Storm and Foul support a powerful optimisation function. A drainage network may be redesigned to a required cover, minimum flow velocity and/or a high outfall level using this function. A floating window with estimated cost updates is also provided via the QuOST module.
 
Click on image for larger view