| |
 |
|
Check
Failure Modes
Simulation
The network, designed in Storm and Schedules, is passed
for this final stage of hydraulic analysis to Simulation.
To test the ultimate capacity of the system it must be
surcharged to the point of flooding. In order to achieve
this Simulation allows extreme rainfalls to be analysed.
Pipes that have been sized for working loads (pipe full
conditions) of between 1 and 5 years RP in Storm should
be tested for return periods in the range of 20 to 30
years in Simulation.
Storage and SC devices can also be dragged and dropped
onto the network for a fully integrated analysis. |
|
|
| Click
on image for larger view |
|
|
| |
|